Difficulty
Moderate
Steps
11
Time Required
1 hour
Sections
1
- Repair an iPhone X That Won’t Charge
- 11 steps
Flags
4
Grammar Police
Embrace your inner English teacher and help improve this guide’s grammar!
Bullets!
Better coordination with markups and the color/type of bullets will help make this guide more clear!
In Progress
This guide is a work in progress. Reload periodically to see the latest changes!
Member-Contributed Guide
An awesome member of our community made this guide. It is not managed by iFixit staff.
BackiPhone X
Full Screen
Options
History
Save to Favorites
Download PDF
Edit
Translate
Get Shareable Link
Embed This Guide
Notify Me of Changes
Stop Notifications
Step 1
Repair an iPhone X That Won't Charge
- First of all, let’s get the motherboard installed and test. The phone turns on normally.
- Plug the charging cable and the lightning bolt shows up. However, there is no charging current on the ammeter.
- Judging by this, the motherboard can detect the power adapter whereas the phone won’t charge.
First of all, let’s get the motherboard installed and test. The phone turns on normally.
Plug the charging cable and the lightning bolt shows up. However, there is no charging current on the ammeter.
Judging by this, the motherboard can detect the power adapter whereas the phone won’t charge.
1024
Step 2
- Since the housing, the battery, and the charging port flex cable used for the test are known-good parts, we need to focus on the charging circuit on the motherboard.
- The first thing we need to do is to separate the upper layer from the lower layer. Place the motherboard on the heating platform and fit a screw into the screw hole on the motherboard. So we can take down the upper layer efficiently afterward.
- Heat the motherboard for 2 minutes on the heating platform at 165℃.
Since the housing, the battery, and the charging port flex cable used for the test are known-good parts, we need to focus on the charging circuit on the motherboard.
The first thing we need to do is to separate the upper layer from the lower layer. Place the motherboard on the heating platform and fit a screw into the screw hole on the motherboard. So we can take down the upper layer efficiently afterward.
Heat the motherboard for 2 minutes on the heating platform at 165℃.
Step 3
- Run diode mode measurement of Pin 2 and Pin 3 on the battery connector J3200. The measured value is normal.
- Continue measuring TIGRIS_LX between charging IC U3300 and Q3350. The measured value is 250, which is abnormal. The normal value should be 0. Judging by the measured value, TIGRIS_LX has open-circuited.
Run diode mode measurement of Pin 2 and Pin 3 on the battery connector J3200. The measured value is normal.
Continue measuring TIGRIS_LX between charging IC U3300 and Q3350. The measured value is 250, which is abnormal. The normal value should be 0. Judging by the measured value, TIGRIS_LX has open-circuited.
Step 4
- L3341 and L3340 are connected in series on the circuit. The open-circuited condition indicates that the two inductors might have been pseudo soldered or damaged. We need to replace the two damaged inductors with new inductors.
- Attach the upper layer to the PCB holder and stick high-temperature tape on components around.
- Heat with QUICK 990AD Hot Air Gun at 300℃ and airflow 3.
- Remove black adhesive around the two inductors.
- Once done, apply some paste flux to the two inductors. Heat with Quick 990AD Hot Air Gun at 360℃ and airflow 3.
L3341 and L3340 are connected in series on the circuit. The open-circuited condition indicates that the two inductors might have been pseudo soldered or damaged. We need to replace the two damaged inductors with new inductors.
Attach the upper layer to the PCB holder and stick high-temperature tape on components around.
Heat with QUICK 990AD Hot Air Gun at 300℃ and airflow 3.
Remove black adhesive around the two inductors.
Once done, apply some paste flux to the two inductors. Heat with Quick 990AD Hot Air Gun at 360℃ and airflow 3.
Step 5
- Pry up the two inductors carefully with the pry knife.
- Continue to apply some medium-temp solder paste to the two bonding pads. Tin the two bonding pads with Soldering Iron at 365℃.
- Then clean black adhesive on the bonding pad.
Pry up the two inductors carefully with the pry knife.
Continue to apply some medium-temp solder paste to the two bonding pads. Tin the two bonding pads with Soldering Iron at 365℃.
Then clean black adhesive on the bonding pad.
Step 6
- Continue to apply some paste flux to the two bonding pads.
- Get the two inductors in the right position, and solder with QUICK 990AD Hot Air Gun at 360℃ and airflow 3.
- Clean with PCB cleaner afterward. Again, let’s run diode mode measurement of TIGRIS_LX between U3300 and Q3350. The measured value is 0, which is normal.
Continue to apply some paste flux to the two bonding pads.
Get the two inductors in the right position, and solder with QUICK 990AD Hot Air Gun at 360℃ and airflow 3.
Clean with PCB cleaner afterward. Again, let’s run diode mode measurement of TIGRIS_LX between U3300 and Q3350. The measured value is 0, which is normal.
Step 7
- Now we need to attach the upper layer and the lower layer to the testing fixture and test. Firstly, clean the bonding pad.
- Then attach the upper layer and the lower layer to the testing fixture.
Now we need to attach the upper layer and the lower layer to the testing fixture and test. Firstly, clean the bonding pad.
Then attach the upper layer and the lower layer to the testing fixture.
Step 8
- Get the charging port flex cable connected.
- Then get the screen and the battery connected.
- Plug the charging cable. The charging current on the ammeter is 860mA, which indicates that the phone can be normally charged.
Get the charging port flex cable connected.
Then get the screen and the battery connected.
Plug the charging cable. The charging current on the ammeter is 860mA, which indicates that the phone can be normally charged.
Step 9
- The next thing we need to do is to solder the two layers together. We need to get the lower layer reballed first. Put the lower layer into the reballing mold and get the BGA Reballing Stencil in position.
- Place the mold onto the base. The stencil is tightly attached to the lower layer because of the magnetic structure of the base. Then we smear some low-temp solder paste on the stencil and wipe off excess solder paste with a lint-free wipe.
The next thing we need to do is to solder the two layers together. We need to get the lower layer reballed first. Put the lower layer into the reballing mold and get the BGA Reballing Stencil in position.
Place the mold onto the base. The stencil is tightly attached to the lower layer because of the magnetic structure of the base. Then we smear some low-temp solder paste on the stencil and wipe off excess solder paste with a lint-free wipe.
Step 10
- After reballing, take the mold down from the base and remove the reballing stencil. Heat the lower layer on the heating platform at 165℃. Once solder balls have shaped up completely, power off the heating platform.
- Cool for 5 minutes. Apply some BGA Paste Flux to the bonding pad and get the upper layer in position.
- Then power on the heating platform. With the temperature reaching 165℃, continue heating for 2 minutes.
After reballing, take the mold down from the base and remove the reballing stencil. Heat the lower layer on the heating platform at 165℃. Once solder balls have shaped up completely, power off the heating platform.
Cool for 5 minutes. Apply some BGA Paste Flux to the bonding pad and get the upper layer in position.
Then power on the heating platform. With the temperature reaching 165℃, continue heating for 2 minutes.
Step 11
- Turn the power off and cool for 5 minutes. Then take down the motherboard from the heating platform. Please check carefully to make sure that the two layers have been soldered together perfectly.
- Now we can assemble the phone and test. Get the motherboard installed and display assembly connected.
- Plug the charging cable. The lightning bolt shows up on the screen. The charging current on the ammeter is also normal. The fault is cleared.
Turn the power off and cool for 5 minutes. Then take down the motherboard from the heating platform. Please check carefully to make sure that the two layers have been soldered together perfectly.
Now we can assemble the phone and test. Get the motherboard installed and display assembly connected.
Plug the charging cable. The lightning bolt shows up on the screen. The charging current on the ammeter is also normal. The fault is cleared.
The lightning bolt shows up on the iPhone X screen while there is no charging current on the ammeter. Check the charging circuit on the motherboard and one rail has open-circuited. Replace the two inductors on the rail and the problem is fixed.